NEW OPERATIONS & ESTIMATING AT ASSEMBLY AND PROJECT LEVEL UPGRADE

Thanks to the new operations and estimating on assembly and project level upgrade, it has become possible to fully estimate on all levels of the Bill of Material => part level, assembly level & project level. Quotation Factory now has in place support for more than 20 operations, out-of-the-box.

In this sprint demo the following topics are therefore covered:

  • 20+ operations added (surface treatments, stamping, deburring, powder coating, etc.);
  • Estimating at assembly level (assembling, welding, …);
  • Estimating at project level (transporting, certification, …).
https://www.youtube.com/embed/4dNAn8ZgGU8